Milšped
As part of the Milšped warehouse and distribution center, Konstruktor built the warehouse facility WH 2, with basic dimensions of 173 x 86 meters, spans of 17 meters, and a structural grid of 18 meters.
About the project
Konstruktor’s scope of work included the construction of the facade and roof steel structure, cladding with thermal insulation panels, and roofing works using a system of trapezoidal sheet metal (TR), stone wool insulation, and PVC membrane.
Within the complex, works were also carried out on the supporting steel structures of the Car Wash facility, Canopy, and the Hazardous Materials Facility, including their roofing and cladding.
Milšped
Krnješevci
16 564 m²
01.07.2013. - 01.11.2013.