项目介绍

Within the warehouse and distribution center “Milšped” a warehouse facility was constructed of WH 2 dimensions 173x86m in the base, with spans of 17m and grids of 18m.

Konstruktor’s work was on the construction of the facade and roof steel skeleton, paneling with façade insulating panels and roofing works in TR sheet system, insulation of rock wool and PVC membranes.

Also, within the complex works were performed on the bearing steel skeleton of facilities Wash Room, Roof Overhang and Facility for Hazardous Substances, as well as their roofing and cladding.
 

44.879755, 20.140654