Project description

The “KLP 2“ facility, occupies the area of 7,000 square meters and it was designed so as to contain functional warehouses and the accompanying offices.

Functionality, design, high quality standards (LEED, FM Global) and the premium logistics location are the characteristics that make the KLP 2 “a new home” for the Schenker company, which owns warehouses and storage spaces in 750 locations of around 8 million square meters in more than 50 countries on all continents.

According by the criteria prescribed for contemporary industrial buildings and structures, the KLP belongs to class “A” structures, which are characterized by a high energy efficiency and, use of premium material brands and location criterion.

This facility is situated in an attractive location along E-70 highway, next to the Šimanovci pay toll, at the western entrance to the city of Belgrade.

General contractor, Konstruktor company, also engaged in the construction of the first KLP complex facility, completed all architectural and construction works, thermo technical, hydro technical and electrical installations, interior designs and activities, as well as for the hard landscaping works according the “turn key”, “design and build” construction system.

www.klp.rs

 

44.889489557671, 20.087882775094