Project description

A very recognizable complex along the highway E70, one that is specific because of its unique architectural design and multi-purpose character, continues to be expanded, and construction works have begun on the third facility in succession, the size of which is 10,350 m2.

KLP 1 was built in 2019, and soon after it, in early 2020, the facility KLP 2 was also constructed, while the third facility KLP 3, with a new green color, will be completed in May 2022 in accordance with the same standards of quality – “A” class standards for modern industrial facilities.

The Konstruktor Company as the general contractor is carrying out all architectural and construction works on this facility as well, and the company is also working on all of the building’s thermotechnical, hydrotechnical and electrical installations, and carrying out interior final craft works and all the works required for the landscaping of the complex, which is being constructed as a “design and build”, “turnkey” project.