Under the turn-key system ‘design and build’, the construction of production and storage facility was contracted for Knjaz Milos Company – the manufacturer of mineral water, soft and energy drinks.
Konstruktor as the general contractor shall complete the construction of the facility in Arandjelovac, whose size is 6700m2, within 6 months.
We look forward to the cooperation with the new client, and at the same time, when we hear those two words ‘Knjaz Milos’, we cannot ignore the cultural heritage, therefore the construction of the facility gives us extra pleasure.
Back in 1811, the first person to explore the mineral springs in the area was Dositej Obradovic, educator and the first minister of education in Serbia, and apart from him there was also a linguist and Serbian language, Vuk Stefanovic Karadzic. Then began the dispensing and delivery of mineral water to the Serbian court.
Due to the visit of Princess Ljubica, in 1839 the first mineral spring was built – the cylinder was installed. Two decades later, the Prince Milos Obrenovic changed the name of Vrbica to Arandjelovac, which marked the beginning of further development of the settlement.
It is quite amusing that the first building in Serbia made of reinforced concrete was the mineral water bottling plant in Bukovik built in 1907.
We are proud to continue the tradition in civil engineering as a famous local construction company in compliance with the highest standards, for the year 2022 and to build another ‘Knjaz Milos’ facility.
Greetings from Konstruktor!




